The Performance Pipe Field Handbook
Table of Contents
NOTICE ……………………………………………………………………………………….. | 8 |
INTRODUCTION ………………………………………………………………………….. | 10 |
CAUTIONS AND NOTICE ……………………………………………………………. | 11 |
Fusion and Joining ……………………………………………………………………….. | 11 |
Leakage At Fusion Joints …………………………………………………………….. | 11 |
Liquid Hydrocarbon Permeation …………………………………………………… | 11 |
Weight, Unloading and Handling …………………………………………………… | 12 |
Testing …………………………………………………………………………………………. | 12 |
Protection Against Shear and Bending Loads ………………………………. | 12 |
Subfreezing Temperatures …………………………………………………………… | 13 |
Static Electricity ……………………………………………………………………………. | 13 |
Electric Tools ……………………………………………………………………………….. | 14 |
Coils ……………………………………………………………………………………………. | 14 |
Locating ………………………………………………………………………………………. | 15 |
Burial …………………………………………………………………………………………… | 15 |
Application Limitations …………………………………………………………………. | 15 |
M & I PRODUCTS AND FEATURES ……………………………………………. | 16 |
Identification Stripes and Colors …………………………………………………… | 18 |
Typical Physical Properties ………………………………………………………….. | 19 |
Pressure Rating Design ……………………………………………………………….. | 22 |
Pressure Surge ……………………………………………………………………………. | 24 |
Pressure Class (PC) ……………………………………………………………………. | 24 |
Working Pressure Rating (WPR) ………………………………………………….. | 25 |
WPR for Typical Operating Conditions …………………………………………. | 26 |
WPR for Other Operating Conditions ……………………………………………. | 26 |
Chemical Resistance …………………………………………………………………… | 27 |
FLUID FLOW ……………………………………………………………………………….. | 28 |
Air Binding and Vacuum Release …………………………………………………. | 28 |
Inside Diameter ……………………………………………………………………………. | 28 |
Hazen-Williams ……………………………………………………………………………. | 29 |
Manning ……………………………………………………………………………………….. | 30 |
Comparative Flows for Slipliners ………………………………………………….. | 32 |
Compressible Gas Flow ………………………………………………………………. | 36 |
Fitting and Valve Friction Losses …………………………………………………. | 37 |
THERMAL EFFECTS ………………………………………………………………….. | 38 |
Unrestrained Thermal Effects ……………………………………………………….. | 38 |
End Restrained Thermal Effects …………………………………………………… | 38 |
Expansion Joints ………………………………………………………………………….. | 41 |
Heat Transfer ………………………………………………………………………………. | 41 |
ABOVE GRADE SUPPORTING …………………………………………………… | 42 |
Support Spacing ………………………………………………………………………….. | 44 |
BURIED PIPE DESIGN ………………………………………………………………… | 47 |
Groundwater Flotation ………………………………………………………………….. | 47 |
WATER ENVIRONMENT DESIGN CONSIDERATIONS ……………….. | 47 |
External Hydraulic Pressure ………………………………………………………….. | 48 |
Submergence Weighting ……………………………………………………………… | 49 |
Floating Pipelines ………………………………………………………………………… | 53 |
RECEIVING AND HANDLING ………………………………………………………. | 58 |
Receiving Inspection …………………………………………………………………….. | 58 |
Unloading …………………………………………………………………………………….. | 59 |
Pre-Installation Storage ………………………………………………………………… | 60 |
Cold Weather Handling ………………………………………………………………… | 62 |
JOINING & CONNECTIONS …………………………………………………………. | 63 |
General Procedures …………………………………………………………………….. | 64 |
Heat Fusion Joining ……………………………………………………………………… | 65 |
Electrofusion ………………………………………………………………………………… | 69 |
Extrusion Welding ………………………………………………………………………… | 69 |
Hot Gas Welding ………………………………………………………………………….. | 70 |
Mechanical Connections ………………………………………………………………. | 70 |
Flange Connection ……………………………………………………………………….. | 73 |
Flange Assembly …………………………………………………………………………. | 78 |
Special Cases ……………………………………………………………………………… | 80 |
Pipe Threads ……………………………………………………………………………….. | 82 |
Pullout Resistant Mechanical Joints ………………………………………………. | 82 |
Partially Restrained Joints ……………………………………………………………. | 84 |
Branch Connections …………………………………………………………………….. | 85 |
Repair Sleeves …………………………………………………………………………….. | 87 |
Repair Connections ……………………………………………………………………… | 87 |
UNDERGROUND INSTALLATION ……………………………………………….. | 88 |
Pipe Embedment Terminology ……………………………………………………… | 89 |
Trenching …………………………………………………………………………………….. | 90 |
Placing Pipe in the Trench ……………………………………………………………. | 93 |
Cold (Field) Bending ……………………………………………………………………. | 93 |
Installing Fabricated Fittings …………………………………………………………. | 94 |
Pipe Embedment Soils ………………………………………………………………… | 95 |
Embedment Backfilling…………………………………………………………………. | 95 |
Joint Restraining with Thrust Blocks………………………………………………. | 96 |
Controlling Shear and Bending Loads…………………………………………… | 96 |
Final Backfilling ……………………………………………………………………………. | 99 |
Poisson Effects ……………………………………………………………………………. | 99 |
The Poisson Effect ……………………………………………………………………….. | 100 |
Connection Restraint Techniques …………………………………………………. | 101 |
Pullout Prevention Techniques………………………………………………………. | 102 |
Pullout Force ………………………………………………………………………………… | 103 |
Special Underground Installation Techniques ………………………………… | 104 |
Sliplining……………………………………………………………………………………….. | 109 |
Proprietary Trenchless Rehabilitation ……………………………………………. | 114 |
SURFACE INSTALLATIONS………………………………………………………… | 115 |
ABOVE GRADE INSTALLATIONS……………………………………………….. | 117 |
UNDERWATER INSTALLATION ………………………………………………….. | 119 |
INSPECTION AND TESTING ……………………………………………………….. | 120 |
Damage Assessment……………………………………………………………………. | 120 |
Leak Testing ……………………………………………………………………………….. | 121 |
OPERATIONAL GUIDELINES ……………………………………………………… | 122 |
Disinfecting Water Mains ……………………………………………………………… | 122 |
Cleaning……………………………………………………………………………………….. | 123 |
GENERAL INFORMATION …………………………………………………………… | 124 |
INDEX …………………………………………………………………………………………. | 130 |
Click link(s) below to print, download and view the details