TABLE OF CONTENTS
INTRODUCTION | 1 |
FEDERAL REGULATIONS | 1 |
QUALIFICATION PROCEDURE | 2 |
HEAT FUSION | 2 |
INCLEMENT WEATHER | 3 |
NOTES ON FUSION CONFIDENCE | 4 |
FUSION CHECKLIST | 5 |
BUTT FUSION | 6 |
PROCEDURE | 6 |
QUALIFICATION | 10 |
SADDLE FUSION | 14 |
DEFINITIONS | 14 |
PROCEDURE | 15 |
QUALIFICATION | 17 |
SOCKET FUSION | 21 |
EQUIPMENT REQUIREMENTS | 21 |
HEATER TEMPERATURE | 21 |
PROCEDURE | 21 |
QUALIFICATION | 23 |
APPENDIX A | 27 |
HYDRAULIC FUSION MACHINE GAUGE PRESSURE | 27 |
REFERENCES | 28 |
FIGURES | |
FIGURE I – BUTT FUSION BENT STRAP TEST SPECIMEN | 10 |
FIGURE II – SADDLE FUSION BENT STRAP TEST SPECIMEN | 17 |
FIGURE III – SOCKET FUSION BENT STRAP TEST SPECIMEN | 23 |
TABLES | |
TABLE I – BUTT FUSION: APPROXIMATE MELT BEAD SIZE | 7 |
TABLE II – BUTT FUSION: BEAD WIDTHS PER WALL THICKNESS | 9 |
TABLE III – BUTT FUSION: TROUBLESHOOTING GUIDE | 13 |
TABLE IV – SADDLE FUSION: MAXIMUM HEATING/MINIMUM COOLING TIMES | 15 |
TABLE V – SADDLE FUSION: TROUBLESHOOTING GUIDE | 20 |
TABLE VI – SOCKET FUSION: TIME CYCLES | 22 |
TABLE VII – SOCKET FUSION: TROUBLESHOOTING GUIDE | 26 |