PolyPipe Fusion Procedures

PolyPipe®

R E C O M M E N D E D

Heat Fusion

Joining Procedures

 

TABLE OF CONTENTS

INTRODUCTION 1
FEDERAL REGULATIONS 1
QUALIFICATION PROCEDURE 2
HEAT FUSION 2
INCLEMENT WEATHER 3
NOTES ON FUSION CONFIDENCE 4
FUSION CHECKLIST 5
BUTT FUSION 6
PROCEDURE 6
QUALIFICATION 10
SADDLE FUSION 14
DEFINITIONS 14
PROCEDURE 15
QUALIFICATION 17
SOCKET FUSION 21
EQUIPMENT REQUIREMENTS 21
HEATER TEMPERATURE 21
PROCEDURE 21
QUALIFICATION 23
APPENDIX A 27
HYDRAULIC FUSION MACHINE GAUGE PRESSURE 27
REFERENCES 28
FIGURES
FIGURE I – BUTT FUSION BENT STRAP TEST SPECIMEN 10
FIGURE II – SADDLE FUSION BENT STRAP TEST SPECIMEN 17
FIGURE III – SOCKET FUSION BENT STRAP TEST SPECIMEN 23
TABLES
TABLE I – BUTT FUSION: APPROXIMATE MELT BEAD SIZE 7
TABLE II – BUTT FUSION: BEAD WIDTHS PER WALL THICKNESS 9
TABLE III – BUTT FUSION: TROUBLESHOOTING GUIDE 13
TABLE IV – SADDLE FUSION: MAXIMUM HEATING/MINIMUM COOLING TIMES 15
TABLE V – SADDLE FUSION: TROUBLESHOOTING GUIDE 20
TABLE VI – SOCKET FUSION: TIME CYCLES 22
TABLE VII – SOCKET FUSION: TROUBLESHOOTING GUIDE 26

 

Click link(s) below to print, download and view the details

PolyPipe Recommended Heat Fusion Joining Procedures